Adelanto, California · 2022
Valew Welding Ground Mount
A 434 kW ground-mount installation at Valew Welding in Adelanto, CA. 909 FastRack 510-6dgs carried 804 modules on graded ground with minimal prep, finishing ahead of schedule on rough terrain.
System size
434 kW-DC
Completed
2022
- Location
- Adelanto, California
- Modules
- 804 × Znshine ZXM7-SHLD144 540W
- Mounting system
- FastRack 510-6dg at 10° tilt
- Mount type
- Ground mount
Why this project worked
- 909 FastRacks supporting 804 × 540W modules
- Installation finished ahead of schedule
- Minimal ground prep — grading, weed barrier, 1/2" drain rock
- 72–80% GCR with low wind and ballast requirements
Overview
Sollega supplied the FastRack 510-6dg racking solution for a ground-mount installation of 804 × 540W modules at Valew Welding in Adelanto, California. The array went up swiftly and finished ahead of schedule thanks to the ease of working with the Sollega racking system.
Ground preparation was minimal: grading, weed barrier, and 1/2-inch drain rock. The FastRack 510-6dg can be installed on asphalt, cement, road base, or any surface with less than a 7° pitch. The racking is made of BASF Ultramid polymer, which will not rust, corrode, or leach metals.
Sollega's FastRack 510-6dg ground-mount solutions feature no-assembly-required racking for quick shipping, staging, and installation. With a 72–80% ground coverage ratio, minimal ground prep, and reduced geotechnical engineering, the system lowers costs and environmental impact. Non-corrosive, non-conductive polymer construction makes it durable on brownfields, landfills, gravel, and low-pitch asphalt. 5°, 6°, and 10° tilt options are available, with full engineering support, wet stamps in all 50 states, and a 25-year USA-made warranty.