Brinkley This 415 kW array powers the city's water supply, ensuring the provision of potable water to the community. With an installation of 1659 modules using the FastRack510 system, we showcase an effective integration of sustainable practices in public utilities.
Department of Energy The U.S. Department of Energy chose Sollega to install a new 223.44 kW system on their headquarters in Washington, D.C. The FastRack 510 system meets high environmental and safety standards that reflect the DOE's commitment to advancing clean energy solutions nationwide.
Hawaii Kahului Our new FastRack510 was used to mount a total of 8,148 72 cell PV modules in an effort by the Hawaii Clean Energy Initiative to achieve 70% clean energy by 2030.
Renton Ikea Our Renton Ikea installation is the largest rooftop solar initiative in Washington State, with a 1.125 MW capacity. Read how our FastRack510 system emphasizes sustainability without compromising on efficiency or environmental compliance.
Inland Star The 523 kW FastRack FR510-5° rooftop system is the first UL3741-compliant array in the U.S., requiring no module-level power electronics. This innovative installation in Fresno, CA, exemplifies Sollega's commitment to quick, efficient, and environmentally sound solar solutions for commercial rooftops.
PGA Headquarters This 950.54 kW rooftop system was installed on the PGA headquarters, showcasing Sollega's expertise in high-wind zone installations with its robust FastRack FR510-6° system. The array demonstrates engineering excellence, optimized for both efficiency and durability under extreme weather conditions.
San Francisco Airport A 1.333 MW rooftop system at San Francisco International Airport, using Sollega's FR510-10°, played a crucial role in helping the Harvey Milk Terminal achieve LEED Gold Certification. This installation demonstrates advanced corrosion resistance and adaptability to complex rooftop conditions.