Tampa, Florida · 2023
DTCC Tampa Headquarters
A nearly 1 MW rooftop PV system on the DTCC's Tampa headquarters, built with FR510-6dg for wind resistance in a coastal storm zone while supporting DTCC's domestic-sourcing preference.
System size
984.55 kW-DC
Completed
2023
- Location
- Tampa, Florida
- Modules
- 2,030 × Q.PEAK DUO XL-G10.2
- Mounting system
- FastRack 510-6dg at 6° tilt
- Mount type
- Rooftop
Why this project worked
- Nearly 1 MW on a critical financial-infrastructure building
- Engineered for Tampa's high-wind, storm-exposed coastal weather
- Glass-reinforced nylon 6/6 for long-term rooftop exposure
- U.S. sourcing and manufacturing aligned to client preference
Overview
As a major financial-infrastructure provider, DTCC's Tampa headquarters plays a critical role in global market operations. The organization undertook a nearly 1 MW solar project as part of its corporate sustainability strategy, targeting long-term energy cost control, improved building performance, and emissions reduction across its U.S. operations. Sollega's FR510-6dg was selected for its rapid installation, proven resistance to high wind and corrosive elements, and domestic material sourcing and manufacturing.
Sollega's history of supporting PV in sensitive coastal areas — including Honolulu and Kahului airports and the San Juan VA Hospital — means the FastRack 510-6dg is well proven for the intense weather of Tampa, Florida.
The preassembled FR510-6dg system is quick to ship, stage, and install, reducing disruption to critical operations in the building below. Manufactured from glass-reinforced nylon 6/6, the racking is resistant to corrosion and suited to long-term rooftop exposure. U.S. material sourcing and manufacturing supported the client's preference for domestic products.