Install/Ground Prep Instruction Sheet

Instruction sheetPDF document

Suggested ground preparation guidelines for properly installing Sollega FR510 racking units, covering site verification, clearing, grading, and the geotextile and aggregate layering required for drainage and stability.

FastRack 510-6dg Ground Mount Guidelines

Suggested ground preparation for proper installation of Sollega FR510 racking units.

  1. All sites should first be verified by a civil engineer to ensure proper drainage and stability.
  2. Clear the site of all vegetation and treat with herbicide.
  3. Grade the site to be within a 0–7° slope.
  4. Install a geotextile layer across the site to prevent organic growth.
  5. Put down a layer of aggregate or road base for drainage (1/2" with a smaller 1/4" on top).
Cross-section detail: the solar panel mounts on the FR510 unit, which sits on an aggregate layer over a geotextile layer, with north oriented toward the leading edge.

Get the original document

Download the source PDF document or open it in a new tab for the full, print-ready version.

More from Ground Mount

Sollega

Sollega provides racking systems that are compatible with most common solar panels on the market today. Our universal design enables the installation of all framed modules. This ensures our clients can continue using their existing supply chains for modules.

Socials

Facebook
LinkedIn
X

Our Location

Sollega Inc.

San Francisco, CA USA

+1-415-648-1299

info@sollega.com

California Green Business Network — San Francisco certified