Ground Mount
Install/Ground Prep Instruction Sheet
Instruction sheetPDF document
Suggested ground preparation guidelines for properly installing Sollega FR510 racking units, covering site verification, clearing, grading, and the geotextile and aggregate layering required for drainage and stability.
FastRack 510-6dg Ground Mount Guidelines
Suggested ground preparation for proper installation of Sollega FR510 racking units.
- All sites should first be verified by a civil engineer to ensure proper drainage and stability.
- Clear the site of all vegetation and treat with herbicide.
- Grade the site to be within a 0–7° slope.
- Install a geotextile layer across the site to prevent organic growth.
- Put down a layer of aggregate or road base for drainage (1/2" with a smaller 1/4" on top).
Cross-section detail: the solar panel mounts on the FR510 unit, which sits on an aggregate layer over a geotextile layer, with north oriented toward the leading edge.